• Practice Recordings
  • SD01
  • Stable Diffusion Galleries
  • Upcoming Events
  • Practice Recordings
  • SD01
  • Stable Diffusion Galleries
  • Upcoming Events
The.VUVU Jah Day?
  • Practice Recordings
  • SD01
  • Stable Diffusion Galleries
  • Upcoming Events
Written by dj@argos.vu on May 23, 2022

Dollard_Dev_Blog

Uncategorized

 

Preparation for Dollard Conference – Built on Asus laptop

 

06/22/2022: DOLLARD17 – incorporated the ico-sphere as containers for labs to fit with the scheme
movement dampening on the cascadian shows a big improvement on quality of movement
Incorporated new slideshow for presentation
Did some planning for arrival taking viewers of event into consideration.

 

06/21/2022: DOLLARD16 – disabled rendering of the skeleton, presentation scaled down.
Actions: sphere/icosohedron/buckyball (geodesic dome) instead of cube for lab,
damping the handle on cascadian
fill the gap between frame and window at back of spacecraft



06/20/2022: DOLLARD15 – frame normals were inverted, clipped to the outside – reworked material for the frame, texture really works now.
Changed the waypoint for the presentation incorporated into spaceship main body in front of skeleton, needs scaling down and skeleton removed for Dollard conference.
Moved spaceship to higher location and increased the far clip plane from 3500 to 5000.

06/19/2022: DOLLARD14 – incorporated the two labs DRoom1/DRoom2 into the platform of the frame,
playing with double sided materials in the skeleton created a bone material.. applied to all mesh geometry in the skeleton which introduced performance issues.
Need to find an efficient material for the skeleton from a performance perspective.




 

06/20/2022: DOLLARD14 – frame normals were inverted, clipped to the outside – reworked material for the frame, texture really works now.
Changed the waypoint for the presentation incorporated into spaceship main body in front of skeleton,
needs scaling down and skeleton removed for Dollard conference.
Moved spaceship to higher location and increased the far clip plane from 3500 to 5000.

 

06/18/2022: DOLLARD13 – inversion of default cube for creation of 2 dark rooms (works beautifully adds a play-space into research and development).
Moved cascadian to internal room on ship, parented to dark room1.
Looking at having interstitial distance between elements adjustable along with movement damping.
Used VivaLaVox lamp for camera direction, became a very useful toy for images.
Looked at cleaning up the tubing, skeleton needs to be lifted to show full feet bones.
Add side to side movement of render texture to face (animation).
For consideration, waypoint adjustment to inside the spaceship.



 

06/17/2022: DOLLARD12 – render to texture duplication of structure added to spaceship – added interactive container for camera.
Removed skeleton from front, better performance.
Noticing the rims are poking through, look at design aspects.
Another collider presented itself, for removal.



 

06/16/2022: DOLLARD11 – imported cascadian from proto3, vertebra L5 brought with it the entire skeletal blender file.
Incorporated Dale’s work from last night into frame discussed bringing radius of bevel down to .01 in front section of ship.
Enjoyed exploring skeletal system at this extremely large scale, and flying through the tunnels.
Performance issues with rendering most likely heavy vertex pipeline load due to new geometry



 

06/15/2022: DOLLARD09/10 – tube generation using the curve path workflow later added double sided material in v10,
interesting experience travelling through tube
– potential teleport possibilities. Worked UV mapping on the bone structure added texture to albedo map.



 

06/12/2022: DOLLARD08 – experimenting with double sided material, took out normal map and surface maps to check lighting…
scaled spacecraft up significantly, inspected inside bones working out how to remove/blend sharp edges.
Put a rail on the edge perhaps… if we want to get exotic have things running around on rail – lights or objects/fish?

 

 

06/12/2022: DOLLARD07 – bought URP Cicadia double sided material and added a VERY BIG spacecraft to MarsExplorer,
think for creative ways to make inside the bones a fun experience, de-collide the lungs.

 

06/12/2022: DOLLARD05/06 the wand works, return to project proto_002

05/22/2022: DOLLARD03 initiation, things to address – wand not showing, scene management, update spaceship to Matt’s newest version, focus on network player.

 

Archives

  • March 2025
  • October 2023
  • September 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • June 2019
  • March 2016

Calendar

July 2025
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
28293031  
« Mar    

Categories

  • Practice_Vids
  • Uncategorized

Copyright The.VU 2025 | Theme by ThemeinProgress | Proudly powered by WordPress